Each OxyFAS Module delivers treatment capacity of 4kg of Ammonia removal or 15kg of COD removal per day. OxyFAS leverages the concept of IFAS with the power of MABR. With OxyFAS you can immediately transform overloaded, inefficient, or even obsolete wastewater treatment plants into high efficiency facilities capable of servicing much higher population equivalents in a matter of weeks.
As plants move towards the end of their working life it often means wastewater is not being treated to the required discharge levels. These installations are operating well beyond their intended lifespan and beyond their intended capacity. These issues all contribute to an inefficient and unsustainable demand for energy.
The MABR can be deployed in a matter of days to supplement the biological treatment capacity of an existing Activated Sludge process and increase the treatment capacity by 50% allowing for either treatment capacity or higher effluent quality. The OxyMem MABR can be retrofitted within a wastewater treatment plant of almost any size often without emptying the tank / basin.
Incremental capacity increase with modular MABR allowing expandable design and enabling a more dynamic asset strategy. Plug and play installation with short start-up period (4-6 weeks)
An automated solution which operates in parallel with existing processes
Capital saving
No additional tanks needed for expansion
Energy savings, a minimum 7x saving on energy costs over CAS
Possible reduction in waste sludge where MABR increases sludge age
The Benefits of 'Sweating the Assets'
Deliver 50% additional treatment capacity in a matter of weeks without draining the tanks adding 50% more capacity to the WWTP by retrofitting a conventional AS system is costly, time-consuming and requires 187.5 m² available space to be built on (Table).
OxyMem MABR module gives a unique possibility to instantly increase the capacity of the existing AS WWTP without creating any additional footprint.
Operational advantages of adding OxyMem MABR as a retrofit. Increasing the capacity of the existing WWTP by 50% corresponds to 50% rise in the energy costs increase when upgrading with AS system. In the case of retrofitting with OxyMem MABR, operational energy expenditure for a year is €1901 versus €8950 spent additionally for the new AS system.